Cemented Backfill Batch Calculator

Estimate dry tailings, binder and water for a target cemented paste backfill volume and paste density.

Cemented Backfill Batch Calculator

FREE ONLINE TOOL
Tailings, binder and water in a backfill batch
TailingsBinderWaterWet batch volume → mass balance
Formula and assumptions

Wet paste mass = volume × density; total dry solids = paste mass × solids fraction; binder = dry solids × binder fraction; dry tailings = dry solids − binder; total water = paste mass − dry solids.

Mass balance only. Binder is a fraction of total dry solids; water is total mix water, so subtract water already present in wet tailings separately. Does not predict strength, rheology or pumpability. Use site-approved mix data.

WHEN IT HELPS

Common uses

  • Estimate material quantities for a planned paste backfill volume.
  • Compare batch quantities while keeping the mix assumptions explicit.

IN PRACTICE

Example

100 m³ at 2.0 t/m³, 75% solids and 5% binder: 150 t dry solids, 7.5 t binder, 142.5 t dry tailings and 50 t total water.

GOOD TO KNOW

Does this calculator design a safe backfill mix?

No. It provides a mass balance only. Wet density, solids concentration and binder fraction must come from an approved mix design or site measurements. It does not assess strength, rheology, segregation, barricade loading or pumpability.