Formula and units

If T is dry tailings mass and b is binder as a fraction of total dry solids, total dry solids S = T ÷ (1 − b), and binder B = S − T. For target solids fraction C, total water W = S × (1/C − 1). Keep percentages as fractions in the formula.

Worked example

With 100 t dry tailings, 5% binder of total dry solids and 75% solids, S = 105.263 t, binder = 5.263 t, and total water = 35.088 t. The wet paste mass is 140.351 t.

Assumptions and limits

This mass balance assumes a defined dry-tailings basis and reports total water, including water already carried by wet tailings. Subtract existing moisture for added process water. It cannot predict UCS, slump, segregation or pipe pressure; those require representative testing and a site-approved design.