Belt Conveyor Capacity in Tonnes per Hour

All tools: Mining & Quarrying

Estimate conveyor throughput from loaded cross-section, belt speed, bulk density and a loading factor.

Open the free tool →

Formula and units

Mass capacity (t/h) = cross-sectional load area (m²) × belt speed (m/s) × bulk density (kg/m³) × 3,600 ÷ 1,000. If the entered cross-section is already the loaded area, do not apply a second fill factor.

Worked example

A 0.08 m² load area at 2 m/s and 1,600 kg/m³ gives 0.08 × 2 × 1,600 × 3.6 = 921.6 t/h before operational derating.

Assumptions and limits

This ideal calculation does not model surcharge angle, belt inclination, lumps, spillage, loading variability, drive limits or safety factors. Use the material’s bulk density and a measured load profile; confirm capacity with the conveyor supplier and site conditions.