Report a problem

TOOLNOZA · LOCAL PROCESSING

OEE Calculator — Availability, Performance & Quality

Calculate OEE and the time lost to downtime, reduced speed and rejected production.

All processing stays in your browser.

Example

480 planned min, 60 downtime min, 30 s/unit, 700 total and 665 good: OEE = 69.2708%.

Method and limitations

Availability = run/planned; performance = ideal cycle × total/run; quality = good/total. Zero production yields 0% quality and OEE by convention. All three losses are expressed in minutes.

Vorne — OEE calculation